Thursday, March 27, 2014

Third setback

See how smart I was to start numbering them?
First, an update on previous setbacks.
We found that the two incorrect vanity cabinets work well to support Peggie's cutting table in  the studio.
Who knew that's where they would end up? Show of hands. Yeah, you guys are all pretty smart.
We also get to keep the incorrect drawer fronts. They will make pretty shelves. Where? You know.
Today the shower floor was going in. The main floor and shower walls are all done, and gorgeous.
We were invited to come up for a look. The shower floor tiles are in 12" x 12" sheets of 1" pieces. Except some of them are not. Some of them are slightly larger, so there are only 11 pieces per row in the square foot sheet. Hmmmm. The lines don't match up. On closer inspection of all the sheets, we actually have four different lots of tiles. Different thickness, different sizes. Whoever filled the boxes didn't look closely enough.
So we went to the tile store. They looked around and found some in Albuquerque. They can be here on Monday. Sure. The tile was supposed to be done and sealed by Saturday. Soooo. We hope the tiles coming are at least all the same size. Doesn't matter which size, just all the same.
Still the carpet is supposed to be done on Saturday, anyway.
The counter top came in and is installed. There are still a few drawer fronts to be changed out. The new ceiling fan works in the bedroom.
We really want to get moved in before I leave. I want to try the new shower.
Stay tuned.

Saturday, March 15, 2014

Kudos to Sears

Our truck needed new tires.
I asked the dealer to give me prices on appropriate tires for my vehicle and my usage.
They came up with three recommendations at three price points.
I went on-line to see what kind of reviews they each had. Finally, I made a choice, but Sears had the same tires listed at considerable savings. So I ordered them through Sears, to be delivered at the store for installation. Yesterday, I got the call that they were in and ready, so I took the truck and a book and went in.
Estimate: one hour.
One hour later I got "The Call." You know, the one where something has come up that will require more services and more money.
This time the problem was that the wrong tires were sent. I ordered E rated tires (10 ply sidewalls) because they resist puncture from cactus and stand up well under towing loads. They delivered 6 ply.
"No problem." The guy says, we can substitute these other tires: different brand, longer warranty, higher mileage rating, higher price.
Luckily, I'm a retired gentleman of leisure. So I say, "If you can get me those tires at the price I already paid, fine. Otherwise, let's reorder and I will come back." And I pointed out that if I was going to pay more money, I could just get the tires I wanted at the dealer. ( Another point I was considering was that Sears are located all over the U.S. and Canada making warranty adjustments easier.)
Nobody wants to lose a customer, so, deal. Better tires at the same price.
Then when I am settling up to leave, the guy informs me that there is a mail-in rebate from the manufacturer and I will get $80 back. SCORE! Their mistake gets me tires worth $130 more, at a savings of $80.
Good job Sears guy.

Thursday, March 6, 2014

When the unusual happens...

I have to write about it.
I adjusted the timer on the drip irrigation system today to account for our warm, dry weather and walked around the yard to assure that all the plants were getting watered. I spotted what looked like a small bird carcass and went to pick it up. But it wasn't a bird carcass. It was a FISH carcass. I guess it was a sand trout who accidentally surfaced in my yard and got confused by the fence and couldn't get out.

Saturday, March 1, 2014

First and second set-backs

Notice I am numbering the set-backs.
Cynical? Nah, realist.
The painters took two days, one to prime, and one to finish. Looks good.
The cabinetry came. The fronts are natural hickory with knots and grain showing. Very pretty.
But.
The drawer fronts are the wrong style. We are told the correct fronts will be sent, no cost to us.
The sections of the vanity that fit under the sinks were supposed to have a cabinet above a drawer. They came with a drawer above the cabinet. Won't work, because the sink drops into the drawer. We are told that the correct models will be sent. Not only no cost, but we get to keep the errors.
One of them can be used when we get around to remodeling the downstairs bathroom, and I am sure we can think of a way to use the other one. At least we will store it somewhere until we figure it out.
We don't know what kind of delays this may cause, but we hope it can be resolved in the two weeks it will take to get the vanity top made.
We have all of the fixtures and hardware either here or on the way. We think. At least all the decisions have been made.  Electrician will do installs next week.
We will be moved in by the end of the month. That is the plan.
Meantime, we have taken advantage of the dumpster bag to get rid of some of the larger pieces of junk around the house. Gee, we didn't even know we had any junk.