Notice I am numbering the set-backs.
Cynical? Nah, realist.
The painters took two days, one to prime, and one to finish. Looks good.
The cabinetry came. The fronts are natural hickory with knots and grain showing. Very pretty.
But.
The drawer fronts are the wrong style. We are told the correct fronts will be sent, no cost to us.
The sections of the vanity that fit under the sinks were supposed to have a cabinet above a drawer. They came with a drawer above the cabinet. Won't work, because the sink drops into the drawer. We are told that the correct models will be sent. Not only no cost, but we get to keep the errors.
One of them can be used when we get around to remodeling the downstairs bathroom, and I am sure we can think of a way to use the other one. At least we will store it somewhere until we figure it out.
We don't know what kind of delays this may cause, but we hope it can be resolved in the two weeks it will take to get the vanity top made.
We have all of the fixtures and hardware either here or on the way. We think. At least all the decisions have been made. Electrician will do installs next week.
We will be moved in by the end of the month. That is the plan.
Meantime, we have taken advantage of the dumpster bag to get rid of some of the larger pieces of junk around the house. Gee, we didn't even know we had any junk.