See how smart I was to start numbering them?
First, an update on previous setbacks.
We found that the two incorrect vanity cabinets work well to support Peggie's cutting table in the studio.
Who knew that's where they would end up? Show of hands. Yeah, you guys are all pretty smart.
We also get to keep the incorrect drawer fronts. They will make pretty shelves. Where? You know.
Today the shower floor was going in. The main floor and shower walls are all done, and gorgeous.
We were invited to come up for a look. The shower floor tiles are in 12" x 12" sheets of 1" pieces. Except some of them are not. Some of them are slightly larger, so there are only 11 pieces per row in the square foot sheet. Hmmmm. The lines don't match up. On closer inspection of all the sheets, we actually have four different lots of tiles. Different thickness, different sizes. Whoever filled the boxes didn't look closely enough.
So we went to the tile store. They looked around and found some in Albuquerque. They can be here on Monday. Sure. The tile was supposed to be done and sealed by Saturday. Soooo. We hope the tiles coming are at least all the same size. Doesn't matter which size, just all the same.
Still the carpet is supposed to be done on Saturday, anyway.
The counter top came in and is installed. There are still a few drawer fronts to be changed out. The new ceiling fan works in the bedroom.
We really want to get moved in before I leave. I want to try the new shower.
Stay tuned.
Subscribe to:
Post Comments (Atom)
1 comment:
Well you left us with a cliff-hanger!
I want to know if it got done and whether you've been able to use the shower.
And, do you have the trailer in place yet?
And, what is your date of departure?
Post a Comment